Achen-Gardner Construction Uses HeavyBid on Pima Road

October 20, 2015 joshespinoza

Achen-Gardner Construction Uses HeavyBid on Pima Road

Achen-Gardner Construction Uses HeavyBid on Pima Road

The goals of the Pima Road – Loop 101 Project were to bring Pima Road up to the City of Scottsdale Master Plan standards, add drainage improvements, improve traffic flows, provide added safety for both pedestrians and vehicles, reduce delay times at intersections, improve non-motorized circulation including equestrian travelers, and preserve neighborhood character.

What makes it interesting?

The Construction-Manager-at-Risk process allowed the city to bring Achen-Gardner on board during the design to provide ongoing and realistic cost information, early coordination with utilities and nearby private and public projects, construction impact expertise, and stakeholder coordination and notification.

How HCSS Software assisted with this project

HeavyBid provided the ability to generate accurate bids quickly. This allows us to generate the volume of bids needed to be successful in today’s competitive market. The fact that labor, equipment, crews, and activities are maintained in a database helps ensure that our bids remain consistent.

Read More About This Project

The post Achen-Gardner Construction Uses HeavyBid on Pima Road appeared first on www.hcss.com.

Read more...

Previous Article
MWH Constructors Uses HeavyJob on Bachman WTP
MWH Constructors Uses HeavyJob on Bachman WTP

MWH Constructors Uses HeavyJob on Bachman WTP The Bachman WTP Project is modifying the water treatment plan...

Next Article
Achen-Gardner Construction Uses HeavyBid on Northsight Blvd.
Achen-Gardner Construction Uses HeavyBid on Northsight Blvd.

Achen-Gardner Construction Uses HeavyBid on Northsight Blvd. The Northsight Blvd. Extension Project improve...