Carolina Bridge Company Uses HeavyJob on Pea Island Emergency Bridge

Carolina Bridge Company Uses HeavyJob on Pea Island Emergency Bridge

Carolina Bridge Company was asked by the NCDOT to construct the Pea Island Emrgency Bridge, a 662-foot bridge to allow the highway to Pea Island to reopen after the damage from Hurricane Irene. They began mobilizing over Labor Day weekend, and in less than seven days had begun construction with six cranes, 50 very hard-working people, and a lot of lights. The company worked 24/7 for 40 days, completing the 662-foot bridge, two large sheet pile structures, and the road work needed to reopen Highway 12 and reconnect the 70 miles of road cut off by Hurricane Irene.

What makes it interesting?

This was an emergency project for the North Carolina Department of Transportation after Hurricane Irene, which created a large breach in Highway 12 on the outer banks of North Carolina and cut off mainland road access for thousand of people.

How HCSS Software assisted with this project

The project was managed with HeavyJob.

Read More About This Project

The post Carolina Bridge Company Uses HeavyJob on Pea Island Emergency Bridge appeared first on www.hcss.com.

Read more...

Previous Article
Ford Construction Uses HeavyJob & HeavyBid on American River
Ford Construction Uses HeavyJob & HeavyBid on American River

Ford Construction Uses HeavyJob & HeavyBid on American River This was Phase II completion of the Intake Str...

Next Article
RE Monks Construction Company Uses HeavyJob & HeavyBid on North Meadows
RE Monks Construction Company Uses HeavyJob & HeavyBid on North Meadows

RE Monks Construction Company Uses HeavyJob & HeavyBid on North Meadows The North Meadows Extension – Tribu...