Millstone Weber Uses HeavyJob & HeavyBid on I-69

October 19, 2015 joshespinoza

Millstone Weber Uses HeavyJob & HeavyBid on I-69

Millstone Weber Uses HeavyJob & HeavyBid on I-69

The I-69 Taylor Ridge to Plummer Creek Project is a $109,600,000 design build contract with Indiana DOT to construct a 2.68 mile section of I-69. Project is all new alignment through a remote and environmentally sensitive area. The project required a 2000′ long bridge with an average height of 60′ to be constructed over the wetlands of Black Ankle Valley.

What makes it interesting?

Extensive ground improvements were completed ranging from high strength fabrics, to wick drains, to staged embankments with chemically modified soils to allow for fills in excess of 100 feet to be made. 4,000,000 cubic yards of material were moved to complete the large cuts and fills on the project.

How HCSS Software assisted with this project

The project is a line item Joint Venture between Millstone Weber and Kolb Grading. Project was bid with HeavyBid. Both companies use HeavyJob. Fueling on the project was done by Kolb Grading with FuelerPlus. Millstone Weber uses The Dispatcher to help manage our equipment needs. Companies have exchanged work between each other and billing back and forth has been completed using tools in HeavyJob.

Read More About This Project

The post Millstone Weber Uses HeavyJob & HeavyBid on I-69 appeared first on www.hcss.com.

Read more...

Previous Article
Achen-Gardner Construction Uses HeavyBid on South Arizona Avenue
Achen-Gardner Construction Uses HeavyBid on South Arizona Avenue

Achen-Gardner Construction Uses HeavyBid on South Arizona Avenue The South Arizona Avenue Project was a str...

Next Article
Achen-Gardner Construction Uses HeavyBid on Centennial Way Project
Achen-Gardner Construction Uses HeavyBid on Centennial Way Project

Achen-Gardner Construction Uses HeavyBid on Centennial Way Project The Centennial Way Project transformed W...