Fuqua Construction Co. Uses HeavyBid on Sink Hole Project

October 15, 2015 joshespinoza

Fuqua Construction Co. Uses HeavyBid on Sink Hole Project

Fuqua Construction Co. Uses HeavyBid on Sink Hole Project

A storm drain failed and created a huge Sink Hole. Fuqua had to shore up and excavate the area to replace the manhole and incoming and outgoing storm pipe.

What makes it interesting?

Fuqua had to bore under a busy highway in order to replace the manhole and incoming and outgoing storm pipe.

How HCSS Software assisted with this project

HeavyBid helped Fuqua accurately compare subcontractor and material bids in order to send out a competitive bid.

Read More About This Project

The post Fuqua Construction Co. Uses HeavyBid on Sink Hole Project appeared first on www.hcss.com.

Read more...

Previous Article
R.E.Monks Construction Company Uses HeavyBid on Emerald Valley Ranch
R.E.Monks Construction Company Uses HeavyBid on Emerald Valley Ranch

R.E.Monks Construction Company Uses HeavyBid on Emerald Valley Ranch Flooding destroyed two dams at Emerald...

Next Article
Flatiron West Uses HeavyBid on SR 520 West Approach Bridge North
Flatiron West Uses HeavyBid on SR 520 West Approach Bridge North

Flatiron West Uses HeavyBid on SR 520 West Approach Bridge North The SR 520 West Approach Bridge North proj...