DeSilva Gates Construction Uses HeavyBid on 1-19 Runway

October 15, 2015 joshespinoza

DeSilva Gates Construction Uses HeavyBid on 1-19 Runway

DeSilva Gates Construction Uses HeavyBid on 1-19 Runway

The Runways 1-19 Runway Safety Area (RSA) Improvements project at the San Francisco International Airport was awarded to Golden Gate Constructors, a Joint Venture of DeSilva Gates Construction and Granite Rock Company. The project involved reconstruction of both ends of the San Francisco Airport’s north/south runways, construction and realignment of various taxiways, construction of new jet blast fences, new airfield electrical lighting equipment, new navigational equipment, drainage modifications and installation of four Engineered Materials Arrestor Systems at the ends of each runway for the safety of aircraft. The project involved 125,000 cubic yards of excavation, 150,000 cubic yards of fill placement, 1.5 million square feet of asphalt grinding, 125,000 tons of cement treated base placement, and 150,000 tons of asphalt placement.

What makes it interesting?

The project was the largest construction project on the airfield since the airport was originally built. In order for this project to be completed, the airport had to completely close two of its four runways for 86 days. During this closure period, 85 percent of contract work was completed by working double shifts day and night for six to seven days a week.

How HCSS Software assisted with this project

Heavy Bid helped DeSilva Gates Construction and Granite Rock Company put together a complete estimate using activity codebooks and material codebooks and helped us manage many Subcontractor quotes using the Quote System with a limited amount of time to complete the bid for the project.

Read More About This Project

The post DeSilva Gates Construction Uses HeavyBid on 1-19 Runway appeared first on www.hcss.com.

Read more...

Previous Article
Diamond Materials Uses HeavyBid on Cranbury Brickyard
Diamond Materials Uses HeavyBid on Cranbury Brickyard

Diamond Materials Uses HeavyBid on Cranbury Brickyard The Cranbury Brickyard project consists of the remedi...

Next Article
Cumberland Valley Constructors Uses HeavyBid on CSX Radnor Yard Pump Station
Cumberland Valley Constructors Uses HeavyBid on CSX Radnor Yard Pump Station

Cumberland Valley Constructors Uses HeavyBid on CSX Radnor Yard Pump Station The CSX Radnor Yard Pump Stati...