Massman Construction Company Uses HeavyBid on Marseilles Lock and Dam

October 15, 2015 joshespinoza

Massman Construction Company Uses HeavyBid on Marseilles Lock and Dam

Massman was involved in the rebuild of tainter gates of the active Marseilles Lock and Dam on the Illinois River just south of Chicago. Five of the eight tainter gates on the dam were damaged by a runaway tow of barges that lost power upstream of the dam. The most critical damage was to gate trunnions, hinges that anchor the gate to the dam. The trunnions between Gates 2 and 3 were severely damaged, and the anchor beam was broken off. Gate 2 was sent downstream and wedged within the dam gate piers.

What makes it interesting?

Repair work will be carefully staged to reduce flooding risk to the city of Marseilles and local areas.

How HCSS Software assisted with this project

HeavyBid helped Massman with efficient estimating and tracking of past productions.

Read More About This Project

The post Massman Construction Company Uses HeavyBid on Marseilles Lock and Dam appeared first on www.hcss.com.

Read more...

Previous Article
Cumberland Valley Constructors Uses HeavyBid on CSX Radnor Yard Pump Station
Cumberland Valley Constructors Uses HeavyBid on CSX Radnor Yard Pump Station

Cumberland Valley Constructors Uses HeavyBid on CSX Radnor Yard Pump Station The CSX Radnor Yard Pump Stati...

Next Article
COP Construction Uses HeavyBid on MDT Judith River Trestle Design-Build
COP Construction Uses HeavyBid on MDT Judith River Trestle Design-Build

COP Construction Uses HeavyBid on MDT Judith River Trestle Design-Build The MDT Judith River Trestle Design...