Massman Construction Uses HeavyBid on Broadway Bridge

October 13, 2015 joshespinoza

Massman Construction Uses HeavyBid on Broadway Bridge

Massman Construction Uses HeavyBid on Broadway Bridge

Massman was involved in building the Broadway Bridge, which is dedicated to the vets of all branches of the military. The $98.4 million bid became the largest ever awarded by the Arkansas Highway Commission, and Massman’s bid was also the shortest in terms of out-of-service length for the bridge. More than 25,000 vehicles cross the bridge each day, which meant construction needed to be very quick. Massman will build part of the substructure of the new bridge while the old bridge is standing, and the entire project is anticpated to be done by January 2017.

What makes it interesting?

This is the largest bid awarded in Arkansas Highway Commission history, and Massman was chosen based on both the lowest bid and the shortest out-of-service time.

How HCSS Software assisted with this project

HeavyBid helped Massman win the project with an efficient bid system.

Read More About This Project

The post Massman Construction Uses HeavyBid on Broadway Bridge appeared first on www.hcss.com.

Read more...

Previous Article
Crowder Construction Company Uses HeavyBid on “The Turn” Seawall
Crowder Construction Company Uses HeavyBid on “The Turn” Seawall

Crowder Construction Company Uses HeavyBid on “The Turn” Seawall “The Battery” is a seawall constructed in ...

Next Article
Bond Bros. Use HeavyBid on MIT.nano Utility Enabling Project
Bond Bros. Use HeavyBid on MIT.nano Utility Enabling Project

Bond Bros. Use HeavyBid on MIT.nano Utility Enabling Project The MIT.nano Utility Enabling Project is locat...